"In all they do, Brookstone’s project teams show they genuinely care about an ongoing partnership with us, and they push to accomplish everything we need to make our projects successful."Angela Branch, Former Executive Director
The Woodlands Methodist Church
"Their team brought the right experience to our project and worked diligently to identify issues that would need some type of resolution well ahead of the schedule. I would happily work with Brookstone in the future and highly recommend them."Don Huml, Construction Manager
East Aldine Management District
"For any public entity or non-profit organization, I would highly recommend Brookstone because of their attentiveness to construction detail and unequaled stewardship of construction dollars."James Knight, Facilities Program Manager
Fort Bend County, Texas
Featured Projects
Education
Conroe Independent School District Walter P. Jett Continuing Education Center
The new two-story building features ballrooms, meeting rooms, conference rooms, collaboration, and makerspaces. The project also included relocating a football stadium scoreboard to within the limits of the existing Natatorium building on the south side of the football field. Some key features include: top of the line audio visual system, back paint glass, supergraphics, glass handrails, wood wall paneling, acoustical wood ceilings in ballrooms, and acoustical cloud ceilings mixed with open ceiling concept.
Municipal
East Aldine Management District Office Building and Town Center Park
The 19,000 SF project includes a new office building housing District offices, meeting rooms, and a second floor viewing deck of the new Town Center Park. The Town Center Park hosts an outdoor performance pavilion, water feature and playground. This project represents a commitment to improve the lives of those living in the area by providing a community space which includes outdoor recreational facilities, public safety and future connection to Keith Weiss Park.
Industrial/Aviation
Entergy Montgomery County Power Station Administration Building
Entergy’s program and site allowed the 12,000 SF, one-story building layout to wrap around an exterior courtyard to maximize natural daylighting for interior offices. Flexible design of the training and conference rooms enable these spaces to multi-function as overnight accommodations during power system emergencies. The adjoining breakroom supports meal preparation for the overnight team. Further flexibility exists in the locker room design as it doubles as a safe-room during hurricanes or extreme weather events. This facility is an integral part of the new 993 megawatt combined-cycle, gas-fired power plant.
Municipal
Fort Bend County ESD No. 4 Fulshear-Simonton Fire Station No. 1
The 2-story station is approximately 31,000 SF, with 70 parking spaces. The site is located on a 26.6 acre track of land located at the intersection of FS 1093 and Ashe Road. The station has six pull-though bays, a training / Emergency Operations Center, day room with raised seating, kitchen with patio, server room, break room, and a small patio off the back stairwell. The major exterior materials consist of stone, brick, metal panel, fiber-cementitious soffit board with a metal roof.
Community/Faith-based
Sagemont Church Student Ministry Building
The new 47,817 SF, 2-story Student Ministry Building consists of approximately 18-20 classroom spaces for Bible study and small groups, a large worship space that accommodates 675 people, a large indoor gathering space, and a small kitchen capable of producing food and drink items for snack bar area. The contemporary interior was designed to appeal to students with exposed metal and industrial / modern features.
The pre-engineered metal building features a brick and stucco exterior, metal roof with a peak and slope, and foundation height raised to resist future flooding, as well as a green gathering space. The scope also includes a limited number of parking spaces adjacent to the outdoor gathering area.
Community/Faith-based
The Cathedral of Our Lady of Walsingham Cathedral High School
The Cathedral High School includes the construction of a two-story private high school building which contains class rooms, parish hall/gymnasium, commercial kitchen, library and common areas, administration offices. The project has approximately 49,286 SF of floor area, renovations of approximately 420 SF of adjacent building, and includes related site improvements. This marks the fifth project Brookstone has completed for Our Lady of Walsingham.
Featured Projects
Education
Conroe Independent School District Walter P. Jett Continuing Education Center
The new two-story building features ballrooms, meeting rooms, conference rooms, collaboration, and makerspaces. The project also included relocating a football stadium scoreboard to within the limits of the existing Natatorium building on the south side of the football field. Some key features include: top of the line audio visual system, back paint glass, supergraphics, glass handrails, wood wall paneling, acoustical wood ceilings in ballrooms, and acoustical cloud ceilings mixed with open ceiling concept.
Municipal
East Aldine Management District Office Building and Town Center Park
The 19,000 SF project includes a new office building housing District offices, meeting rooms, and a second floor viewing deck of the new Town Center Park. The Town Center Park hosts an outdoor performance pavilion, water feature and playground. This project represents a commitment to improve the lives of those living in the area by providing a community space which includes outdoor recreational facilities, public safety and future connection to Keith Weiss Park.
Industrial/Aviation
Entergy Montgomery County Power Station Administration Building
Entergy’s program and site allowed the 12,000 SF, one-story building layout to wrap around an exterior courtyard to maximize natural daylighting for interior offices. Flexible design of the training and conference rooms enable these spaces to multi-function as overnight accommodations during power system emergencies. The adjoining breakroom supports meal preparation for the overnight team. Further flexibility exists in the locker room design as it doubles as a safe-room during hurricanes or extreme weather events. This facility is an integral part of the new 993 megawatt combined-cycle, gas-fired power plant.
Municipal
Fort Bend County ESD No. 4 Fulshear-Simonton Fire Station No. 1
The 2-story station is approximately 31,000 SF, with 70 parking spaces. The site is located on a 26.6 acre track of land located at the intersection of FS 1093 and Ashe Road. The station has six pull-though bays, a training / Emergency Operations Center, day room with raised seating, kitchen with patio, server room, break room, and a small patio off the back stairwell. The major exterior materials consist of stone, brick, metal panel, fiber-cementitious soffit board with a metal roof.
Community/Faith-based
Sagemont Church Student Ministry Building
The new 47,817 SF, 2-story Student Ministry Building consists of approximately 18-20 classroom spaces for Bible study and small groups, a large worship space that accommodates 675 people, a large indoor gathering space, and a small kitchen capable of producing food and drink items for snack bar area. The contemporary interior was designed to appeal to students with exposed metal and industrial / modern features.
The pre-engineered metal building features a brick and stucco exterior, metal roof with a peak and slope, and foundation height raised to resist future flooding, as well as a green gathering space. The scope also includes a limited number of parking spaces adjacent to the outdoor gathering area.
Community/Faith-based
The Cathedral of Our Lady of Walsingham Cathedral High School
The Cathedral High School includes the construction of a two-story private high school building which contains class rooms, parish hall/gymnasium, commercial kitchen, library and common areas, administration offices. The project has approximately 49,286 SF of floor area, renovations of approximately 420 SF of adjacent building, and includes related site improvements. This marks the fifth project Brookstone has completed for Our Lady of Walsingham.